Project: Framo Multiphase Pump Changeout

Location: Western Australia

Client: Woodside Energy Ltd.

Field: Vincent, located NW of Exmouth, WA

Vessel: Nor Australis

Water depth: 363msw

Summary: Installation and operation of large A-Frame and articulating guide wire system onto the Nor Australis for recovery of Framo Multiphase Pumps.  The system was rated for recovery up to 2.5m Hs which given the size and weight of the pumps was innovative.  Recovery using the guide wire systems worked extremely well with zero downtime experienced on the project.

ID: 0084